There are 724 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Cabo verde
|
Community Based Adaptation
|
2012
|
35,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: CPV/SIDS-CBA/12/22 |
|
In Cape Verde, more specifically on the island of Santo Antão in the town of Lagoa, Companhia, and Matinho, there are serious deficiencies related to water distribution. The population in these localities needs to move large distances, i.e more ( ... )
km to obtain and transport water for domestic use and for livestock. Such survival conditions reflect negatively on the quality of life of communities and even school attendance of children, often contributing to their families in obtaining and transporting water.
The Associação Recreativa Mãos Unidad Companhia, in partnership with Projecto de Reforço das Capacidades de Adaptação e
|
|
|
Cameroon
|
Community Based Adaptation
|
2012
|
58,083.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: CMR/CBA/AAP/12/03 |
|
Le projet de Promotion de la Valorisation Agricole Saisonnière des Ressources en Eau des Bas-fonds (Promo-VASREB) de la commune de Mbalmayo est une initiative du Centre International de Promotion de la Récupération (CIPRE), conçue en vue ( ... )
mpagner les populations agricoles des zones urbaines et périurbaines dans leurs efforts quotidiens de résistance et d?adaptation aux changements climatiques. Les exploitants agricoles de cette commune souffrent dans leur activité des caprices climatiques dont ils ne maîtrisent plus ni les saisons des pluies ni les saisons sèches tant du point de vue de leurs débuts, de leurs durées que de
|
|
|
Mauritius
|
Community Based Adaptation
|
2012
|
1,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: MAR/SIDS-CBA/Yr1/12/02 |
|
In planning the full project, the PTA and RCEA will meet with stakeholders (parents, staff and surrounding communities) to perform a vulnerability risk assessment using the proposed methodologies (CVCA mixed with CRiSTAL). We will also do a workshop ( ... )
sitizing stakeholders about risks associated with climate change and about how climate change may impact our livelihoods as a SIDS. As part of the consultation, we will also validate the original project idea submitted at the concept note level and make modifications to the original concept based on feedback from the VRA. We will engage in technical consultations to finalize the plans for
|
|
|
Cambodia
|
Community Based Adaptation
|
2012
|
49,716.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/68 |
|
Findings from VRA conducted on 21 September 2011 with 31 participants, 22 women, in 3 target villages show a number of problems including drought, shortage of water for irrigation, due to lack of irrigation scheme, human and animal health problems, ( ... )
xhaustion, increased heath, irregular rainfall, and lack of understanding of CC and lack of skilled human resources.
According to the VRA, local people suggested development of a weir at Teal Mreah, with three sluice gates, and rehabilitate a 400m canal to divert water for irrigating 700ha rice field, and capacity development for climate resilient agricultural technology. The project, in this
|
|
|
Cameroon
|
Community Based Adaptation
|
2012
|
53,432.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: CMR/CBA/AAP/12/01 |
|
Le projet intitulé « Projet de réduction de la vulnérabilité des populations d?Edéa et de Kribi face aux aléas des changements climatiques » est conçu pour permettre aux populations riveraines des zones de mangroves et des écosystèmes ( ... )
és de développer les équipements leur permettant de s?adapter aux changements climatiques qu?elles vivent depuis quelques années. Ce projet porte sur la construction des infrastructures pouvant permettre aux populations ciblées de s?adapter aux changements climatiques.
. Il se déroulera à Edéa et à Kribi respectivement chef lieu des départements de la Sanaga Maritime (région du
|
|
|
Cabo verde
|
Community Based Adaptation
|
2012
|
15,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: CPV/SIDS-CBA/12/21 |
|
The beneficiaries of this project are 07 (seven) families with about 28 people including men, women, who will benefit from the rehabilitation of a hydroponic structure and a new unit with about 100-150m2.
To achieve the propose outpust, the ( ... )
ação dos Amigos do Ambiente da Aldeia de Cova de Barro (Santa Cruz, Santiago Island) outlined a set of activities, from identification and awareness of project beneficiaries, training and information sessions, and the rehabilitation and construction of greenhouses, including training sessions on Hydroponics production
|
|
|
Togo
|
Community Based Adaptation
|
2012
|
24,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: TGO/SGP/OP5/Y2/CORE/CC/12/15 |
|
Avec les changements climatiques, la région de la Kara connaît de plus en plus une perturbation des saisons qui se caractérise par des indicateurs à plusieurs facettes : irrégularité, arrivée tardive et mauvaise répartition des pluies, fin ( ... )
ce ou tardive des pluies par rapport à la normale. Les feux de végétation, aggravés par les vents violents et les températures élevées, autres conséquences des changements climatiques, affectent directement la fertilité des terres cultivables qu?ils dégradent. Il s?en suit une érosion des terres avec pour conséquences une baisse des rendements agricoles, une insécurité alimentaire
|
|
|
Fiji
|
Community Based Adaptation
|
2012
|
5,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KIR/MAP-CBA/11/01 |
|
? Undertake participatory planning activities with the community of Rurete Village ? toward the design of a final project to be considered for MAP CBA funding
? Complete VRA awareness activities with the community of Rurete village, and identify ( ... )
dicators for the final project
? Participatory engagement by all partners, stakeholders toward final adaptation plan as well as budget for final proposal
? Undertake required baseline assessments for the Rurete Community ? toward final MAP CBA
|
|
|
Trinidad and tobago
|
Community Based Adaptation
|
2012
|
2,500.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: TRI/SIDS-CBA/12/01 |
|
Over the past five years there has been an increase in the number of turtles being seen at San Souci beach (Big Bay). This has resulted in the Forestry Division initiating basic patrols for a period of four months (April to July) on the beach. The ( ... )
on provides funding for 1 person to patrol the beach. The Forestry Division has worked with the Toco Foundation in the past to protect the beach but has in recent (the last two years) past resolved to work the local community group to patrol the beach and ensure the protection of the turtles. In peak nights over 30 thirty turtles are seen nightly as a result of the patrol efforts. There are
|
|
|
Jamaica
|
Community Based Adaptation
|
2012
|
20,000.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: JAM/SIDS-CBA/12/02 |
|
Drought period for the past 20 years has gotten increasingly longer which has brought us to this point today where we experience approximately 8 months of drought. This change is also evident in an increase in our overall temperature. These climate ( ... )
s are a direct result of deforestation for the purpose of bauxite mining. The project seeks to: develop sustainable water harvesting system, build awareness about the productive use of rainwater harvesting and increase the community?s capacity to apply adaptive management tools in Sustainable Land
|
|
|
Cambodia
|
Community Based Adaptation
|
2012
|
49,630.59
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2012/23 |
|
Project Goal: Strengthening the community?s capacity for drought adaptation through improving water irrigation management of Prey Peay reservoir.
Project Objectives:
1) Increase accessibility to water irrigation for drought adaptation for ( ... )
milies with 193 ha of early wet season rice and 1,164 families with 669 ha of wet season rice in 8 target villages of Toul Ampil commune.
2) Improve rice production techniques of 160 target families by helping them to change their practical behavior from 1 to 2 times rice growth per year through promotion of the SRI techniques application.
Expected Outputs:
Output 1.1: 2,950 m of canal,
|
|
|
Cambodia
|
Community Based Adaptation
|
2012
|
38,586.80
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: KHM/SGP/CCBAP-sida/2012/27 |
|
Vulnerability reduction and increasing understanding on water management at Snom Kapei and Maharosey communes through rehabilitation of Ang Rea community pond aims at 1-increasing the water using for 411 families, 2,157 people, and 1,100 females in ( ... )
ages in Snom Karpei and Maharosey communes and 2- Increasing using of clean water for 80 families.
Objectives:
1. Increase accessibility for daily use of water for 411 families, 2,157 people (1,100 females) by rehabilitating community pond at 4 villages of Snom Krapei and Maharosey communes, Korng Pisey district, Kampong Speu province.
2. Improving clean water use for 80 families by proving
|
|
|
Mauritius
|
Community Based Adaptation
|
2012
|
2,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: MAR/SIDS-CBA/Yr1/12/01 |
|
1. Background research - general secondary research to include policy analysis, institutional mapping, key informant interviews, and collation of existing datasets maps and meteorological data.
2. Planning Workshop 1- between 20 and 30 ( ... )
entatives from the local community would be invited to attend the workshop. During the workshop participatory tools would be used to discuss the issues and identify potential solutions to include: Hazard Mapping, Seasonal Calenders, Historical Timeline, Vulnerability Matrix, and Venn Diagrams (as listed in the CARE VRA Handbook).
3. Compilation and Analysis, using the CRisTAL tool.
4. Planning
|
|
|
Jamaica
|
Community Based Adaptation
|
2011
|
43,895.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: CBA/JAM/SPA/10/01 |
|
The NGO - Portland Environment and Protection Association is implementing a sustainable land management programme, that employs better agricultural practices, to address deforestation, soil erosion and nutrient depletion while enhancing the skills ( ... )
mers to protect their land, improve livelihood, while increasing their awareness of the effects of climate variability and
|
|
|
Morocco
|
Community Based Adaptation
|
2011
|
1,585.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CBA/MAR/SPA/2011/01 |
|
La zone de projet se situe en zone de moyenne montagne, à une altitude variant entre 2000 et 2500 m. Le climat de la zone est dit semi aride, et présente des amplitudes de températures fortes entre les saisons d?hiver (très froides) et d?été ( ... )
chauds). La pluviométrie moyenne annuelle est de 500mm, ce qui est légèrement inférieur à la pluviométrie médiane au Maroc.
Depuis les années 1980, les impacts des changements climatiques (augmentation des températures et des périodes de sécheresse, diminution des précipitations) touchent les populations locales, vulnérables (la zone est parmi les plus pauvres du Maroc) qui
|
|
|
Morocco
|
Community Based Adaptation Community Based Adaptation
|
2011
|
25,354.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: CBA/MAR/SPA/2011/04 |
|
Localisée dans le Rif Oriental, à quelques kilomètres du littoral méditerranéen, la communauté de Boumaad (environ 320 habitants) vit essentiellement d?une agriculture traditionnelle de montagne et de l?élevage extensif. Le village, situé au ( ... )
d?une montagne, entourée de cours d?eau, souffre d?un fort enclavement et d?un manque d?infrastructures de base, qui ont poussé une grande partie de la population à émigrer (aujourd?hui les femmes constituent 75% de la population du village). Le climat de base, typiquement méditerranéen (étés chauds et très secs ; hivers doux et humides), évolue progressivement sous l?effet des
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
44,103.50
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/34 |
|
The project was developed with the participation of local communities and authorities, community fisheries committees, and local officials from Peam Chor district Office of Agriculture, Forestry and Fisheries, and of the Fisheries Administration, ( ... )
aff of Chetthor organization.
Before the project proposal was developed, the community fisheries committees from three communes conducted Vulnerability Reduction Assessment (VRA) in 10 target villages through a process facilitated and coordinated by Chetthor staff and thus defined community?s priority issues and needs in relation to climate change (biodiversity) to build their capacity to adapt
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
35,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/57 |
|
The project is developed with the participation of CFi committee, local authorities at village, commune and district levels, officials from Peam Ror district Office of Agriculture and Fisheries Administration, and Chetthor.
Prior to the project ( ... )
ation, an VRA was undertaken with 2 target villages out of 4 with facilitation and guidance from Chetthor staff, and identified priorities defined by communities in their response to CC and biodiversity as part of the need for their adaptation to impacts of CC.
VRA findings show that drought has occurred more frequently leading to shortage of water for domestic use and for irrigating dry season
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
49,518.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/40 |
|
The project was formulated as a result of participation by local villagers, Community Fisheries (CFi) committee, local authorities at village and commune levels, officials from provincial Department of Agriculture (DoA), Department of Water ( ... )
ces and Meteorology (DoWRAM), provincial Fisheries Cantonment (FiAC), and staff of Chetthor in VRA assessment in the target villages. Findings from the VRA show that drought has occurred more frequently since 1995, and irregular flooding was observed since 2000, leading to severe shortage of water for household consumption and for irrigation, and some natural ponds become shallower due to
|
|
|
Cambodia
|
Community Based Adaptation
|
2011
|
33,787.00
|
OP5- Y1 (Jul 11 - Jun 12)
|
|
Project Number: KHM/SGP/CCBAP-Sida/2011/62 |
|
Findings from VRA by ARD with 104 participants, 42 female, conclude that for the last 30 years drought has been accelerating and heat is more prevalent in the dry season and last longer. Climate extremes have been causing severe problems such as ( ... )
ge of water for both domestic use and irrigation. VRA has identified a number of recommendations as follows:
- Raising more awareness on health related issues;
- Improving or maximizing existing water holding facility; and
- stablishing functional community resource management mechanism.
The project will assist 6,263 members, 3,157 women, from 1,271 households in 8 local communities of Cham
|
|
|