There are 12,310 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Indonesia
|
Biodiversity
|
2002
|
35,000.00
|
Phase 2
|
|
Project Number: INDO/02/30 |
|
Project Development Goal :
Developing Integrated Farming System for community empowerment in Jangkaran Village
Project Objectives :
1. To develop integrated farming system by using local natural resources potency based on basic concept of ( ... )
orestry in the critical sandy land in coastal area.
2. To develop windmill for water pumping to support integrated farming system and to utilize husbandry waste to produce biogas energy for cooking.
3. To Disseminate information about important values of complex ecosystem.
Expected Output :
1. A model of integrated farming system.
2. Rehabilitated beach forest as a windbreak along Congot
|
|
|
Albania
|
Biodiversity
|
2002
|
7,850.00
|
Phase 2
|
|
Project Number: ALB/02/02 |
|
The project aims at documenting the state of underwater beds of P. oceanica along the Albanian seacoast and raising awareness of coastal villagers, environmental institutions and local and central authorities on the importance of this species to the ( ... )
environment.
Product of this project will be a disseminative documentary film emphasizing on the importance of P. oceanica habitats. Several public awareness activities will take place, such as discussions with local communities and fishermen in different areas, production and distribution of leaflets, posters and a seminar in the capital city of
|
|
|
India
|
Biodiversity
|
2002
|
20,855.00
|
Phase 2
|
|
Project Number: SGP/GEF/IND/OP2/02/KAR03 |
|
The project laid emphasis on the in-situ conservation of rare and indigenous plant species (NTFPs); identify and employ simple processing techniques to add values to NTFPs by involvement of local communities; in-situ conservation activities and ( ... )
ishing a marketing network for NTFPs to improve the socio-economic conditions of the local communities; prioritize the most common and abundant NTFPs in the selected project area and the capacity building of the communities including women through training and action programmes to conserve and enable sustainable harvesting of selected forest produce.
|
|
|
Bolivia
|
Biodiversity
|
2002
|
7,052.79
|
Phase 2
|
|
Project Number: BOL/27/01 |
|
El proyecto esta constituido por tres componentes organizados de forma secuencial, de manera que los productos y resultados alcanzados en el primer componente sirvan de insumos para el segundo y estos se presenten sistematizados en el tercero. Los ( ... )
imeros componentes tienen elementos comunes como la temática, los actores, los productos y las acciones de difusión.
El objetivo general de las jornadas es el de generar espacios de dialogo e intercambio de criterios en torno al ecoturismo entre los actores vinculados a la gestión y desarrollo del ecoturismo de las diferentes regiones del
|
|
|
Malaysia
|
Biodiversity
|
2002
|
50,000.00
|
Phase 2
|
|
Project Number: MAL/02/27 |
|
The project will build a partnership among NGOs, local government, local communities and the private sector in the Kelana Jaya area of Petaling Jaya in Selangor to rehabilitate several polluted lakes and improve their biodiversity. The main ( ... )
ives of the project are to: promote the rehabilitation of the Kelana Jaya lakes ecosystem and its associated biodiversity; enhance the involvement of local communities in environmental monitoring activities and rehabilitation of the Kelana Jaya lakes ecosystem; and build up the capacity of government agencies, NGOs and local communities to work together in smart partnership for the protection
|
|
|
Malaysia
|
Biodiversity
|
2002
|
1,990.00
|
Phase 2
|
|
Project Number: MAL/01/16 |
|
Development of a full project proposal through: (i) workshops and dialogues with the residents of the Kelana Jaya community, members of the Global Environment Centre and the Malaysian Anglers Association, and all stakeholders in the Kelana Jaya ( ... )
atchment; and (ii) rapid assessment of the lake biodiversity and current levels of water pollution. The proposed project aims to improve the water quality of the Kelana Jaya lake, which is based in an urban area, and restore the wildlife around the threatened
|
|
|
Albania
|
Biodiversity
|
2002
|
5,100.00
|
Phase 2
|
|
Project Number: ALB/02/21 |
|
This project aims at educating school children on the significant ecological values of the Dajti National Park, the categories of IUCN for protected areas, the threats to these values and ways of protecting them. The students will be engaged in ( ... )
ary activities such as preparation and distribution of leaflets and posters, cleaning up of the highly frequented areas, setting up of awareness tables, etc. The assistance of the Forestry Department, Educational Directorate, teachers will contribute to a successful implementation of the project.
Ecological Day of the Dajti National Park will be included in the school
|
|
|
Uganda
|
Biodiversity
|
2002
|
40,000.00
|
Phase 2
|
|
Project Number: UGA/02/17 |
|
The project is managed by the National Strategy for the advancement of rural women, a local CBO in Kotido district.It aims at improving the livelihood of the local communities in karamoja through beekeeping to generate income while ensuring ( ... )
nable conservation of natural resources thereby conserving the forest ecosystem. Beekeeping an enterprise is also seen as a viable conservation practice that helps integrate peace and conflict issues in the area synonimous with cattle raiding by establishing links with other partners and conserve indigenious trees species threatened with destruction. The project promotes alternative income
|
|
|
Poland
|
Biodiversity
|
2002
|
19,950.00
|
Phase 2
|
|
Project Number: POL/01/37 |
|
Improvement of environmental conditions of Karsiborska Kepa Reserve through regulation of water system.
- Prepared technical design of modernisation of irrigation system in Krasiborska Kepa Reserve;
- received permission from the Board of ( ... )
ation and Water Devices for renovation of flood bank and pump station;
- conservation of the main channel and construction of river wtare inlet;
- creation of conditions for acces of tourists to certain parts of Reserve.
|
|
|
Brazil
|
Biodiversity
|
2002
|
14,177.10
|
Phase 2
|
|
Project Number: BRA/02/13 |
|
An ecotourism operation will be implemented in the Nova Esperança Indigenous Village, having a set of trails as its main attraction. The trails, to be hiked, will have their biodiversity interpreted and explained by indigenous guides with special ( ... )
ng. Products, handcrafts, and room and board services will be offered to add value to the tourist attraction. The region around the village is mountainous and covered in woods, inserted in the transition between the low savannah in Brazil and the high savannah in Venezuela. The activities planned include the construction of the set of trails, visitor?s center, handcrafts center, and tourist
|
|
|
Peru
|
Biodiversity
|
2002
|
36,940.00
|
Phase 2
|
|
Project Number: PER/01/08 |
|
El humedal ?El Tubo? viene siendo objeto de impactos negativos ocasionado por la actividad humana, entre las primeras podemos senalar la contaminación con residuos domésticos. También se observa una disminución del nivel de agua, siendo ( ... )
rio investigar sus causas. Este frágil ecosistema constituye un hábitat importante para las aves, mucho de los cuales se encuentran en peligro de extinción.
El proyecto promoverá la conservación y gestión sostenible de los recursos del Humedal ?El Tubo?, la organización y capacitación de los pobladores, así como la elaboración y gestión de proyectos productivos.
Las
|
|
|
Philippines
|
Biodiversity
|
2002
|
32,231.00
|
Phase 2
|
|
Project Number: PHI/17/02 GEF-RNE |
|
The project aims to conserve the biodiversity in the lakes influence area and restore the different life support systems, and contribute and enhance increased agricultural and fishery production on a sustainable equitable basis. The project shall ( ... )
landscape approach, addressing the upland, lowland and freshwater ecosystem of six (6) barangays in Kitcharao.
Activities include capacity building, forest and lake ecosystems conservation, protection and management, policy advocacy and livelihood (animal raising, fish culture, sustainable
|
|
|
Philippines
|
Biodiversity
|
2002
|
45,654.70
|
Phase 2
|
|
Project Number: PHI/15/02 GEF-RNE |
|
The project seeks to protect and rehabilitate the remaining resources through community participation. To achieve these objectives, the project strategy involves the conservation and protection, sustainable area management and organization of ( ... )
s/fishefolks into association/cooperative that can eventually participate in the management of the project.
The realization of these project goals is expected to have a great impact to the marsh and its occupants. Rehabilitation and regeneration of forest cover of the marsh bring back the biodiversity/habitat and increasing income among community memebrs in the long run, assume social benefit
|
|
|
Guatemala
|
Biodiversity
|
2002
|
615.14
|
Phase 2
|
|
Project Number: GUA/02/03-PG |
|
This is a found for make a project for full grant. |
|
|
Poland
|
Biodiversity
|
2002
|
50,000.00
|
Phase 2
|
|
Project Number: POL/02/08 |
|
Classical agro-biodiversity project with wide campaign promoting traditional native varieties of cereals, vegetables, native breed of animals (Polish red cow, spotted pig, poultry icluding green legged partridge, small wild horse, sheep (olkuska ( ... )
.
Pilot plots with primitive variety of wheat (orkisz), and wyszoborski potato were prepared.
Small gardens and orchads were renovated (vegetables, old variety of fruit tree).
These activities gave the initial ground for development of local products based on old varieties and breeds;
selected and committed farms became of a good base for extensive workshops, trainings about ecological
|
|
|
Poland
|
Biodiversity
|
2002
|
1,000.00
|
Phase 2
|
|
Project Number: POL/01/10p |
|
Project preparation |
|
|
Malaysia
|
Biodiversity
|
2002
|
50,000.00
|
Phase 2
|
|
Project Number: MAL/01/20 |
|
This capacity-building project aims to ensure watershed areas in Sabah are protected and conserved by local communities; address land tenure issues to ensure community interests in resource management are addressed; provide environmentally-sound ( ... )
ic activities; and raise awareness on the importance of wildlife management and indigenous natural resource management
|
|
|
Indonesia
|
Biodiversity
|
2002
|
35,295.00
|
Phase 2
|
|
Project Number: INDO/02/29 |
|
Project Development Goal :
Healthy coral reef ecosystems and better quality of livelihood in Pulau Panggang and Pulau Kelapa Village, Kepulauan Seribu Utara Subdistrict, Kepulauan Seribu Regency, North Jakarta.
Project Objectives :
1. To ( ... )
coral reef ecosystem through collaborative management between stakeholders
2. To promote environmentally friendly fishing tools
3. To open and widen business opportunities for communities.
4. To develop information management system.
Expected Output :
1. A model of community-based coral reef management
2. High growth percentage of coral reef on the permanent demonstration
|
|
|
Malaysia
|
Biodiversity
|
2002
|
50,000.00
|
Phase 2
|
|
Project Number: MAL/01/17 |
|
This capacity-building pilot project aims to introduce conservation training among the indigenous Semai community in Ulu Geroh, Perak to conserve and sustainably manage the threatened Rafflesia plant and the Rajah Brooke birdwing butterfly. This ( ... )
e done by providing the Semai with training on nature guiding, sustainable Rajah Brooke birdwing butterfly farming, and creating a conservation area to protect the Rafflesia and Rajah Brooke. Alternative sustainable livelihoods will be introduced to the Semai and linked back to their management of the conservation
|
|
|
Philippines
|
Biodiversity
|
2002
|
44,045.75
|
Phase 2
|
|
Project Number: PHI/14/01 GEF-RNE |
|
The project aimed to contribute towards the conservation of the biodiversity in key resource areas around Lake Mainit. The project was developed and considered for funding under the UNDP GEF/RNE SGP and PACAP Partnership for Biodiversity ( ... )
vation for Lake Mainit.
The project is environmental protection and conservation activities, mainly, focusing at protecting biodiversity in the lowland, upland and lake ecosystem in Lake Mainit. The project in addressing environmental conservation and development in the community, will harness the community todo the right approach since they are the shock absorber of the ill effects of
|
|
|