Lao
|
Climate Change Mitigation
|
2009
|
49,595.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: LAO/SGP/OP4-Y3/CORE/CC/09/08 |
|
this project is covering in multi-area by its nature; however, key aims are promoting alternative energy use for income generation activities after completion of on farm activities by villager in the valley of Paklai district, Xayabouly province. ( ... )
llage is Mmong ethnic. Side positive impact of this project, by building small hydropower plant, villager can make small pipe in different section of the dam for the gravity system to the village that really help women in fetching water after arriving home from hard working in paddy field. The project has been also approaching village forest conservation where the dam can have water all year
|
|
|
Solomon islands
|
Climate Change Mitigation
|
2009
|
41,026.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: SLB/SGP/OP4/Y3/CORE/CC/2009/02 |
|
Sobiro commuinity is situated on th Island of Gatokae in the Western Province(see map in annex 1-project propsal document), Solomon Islands. It has a population of around 600 people includng little children. The community is scattered around an aera ( ... )
nd 1.5km.
Sobiro comunitylike many other rural communities in the Solomon Islands has for many years utilize the use f kerosine for lighting and cooking needs. This is seen as a cheaper use of providing lightings for their every night activities as compared to diesel and petrol generators. No with the problem of emitting greenhouse gas by using kerosine, it is seen that the use of solar can be
|
|
|
Malawi
|
Biodiversity Biodiversity
|
2009
|
44,321.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: MLW/SGP/OP4/Y2/CORE/2008/04 |
|
Soche Mountain is one of the forest reserves in Malawi. It is situated right on the edge of the City of Blantyre and is one of the several isolated peaks that form part of the Shire highlands on the eastern side of the Rift Valley in southern ( ... )
. It rises to a height of 1,533 metres a.s.l. and supported some 150 hectares of mid-altitude rainforest in the early 1980s. The Brachystegia woodland on the lower slopes provided a buffer zone against human pressure but the south-east (both woodland and forest) have been laid bare now. The 30-metre tall forest on the ridge is fairly luxuriant and still largely intact, with Albizia schimperana,
|
|
|
Pakistan
|
Climate Change Mitigation
|
2009
|
42,141.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: PAK/SGP/OP4/RAF/09/47 |
|
Project objectives:
1.Identification of Environmental problems especially trends of deforestation in Badin city and their possible solutions through a comprehensive research survey
2.Introduction of trend of GREEN BADIN through tree ( ... )
tion and awareness campaign
3.Capacity building and civic education of a pool of 1000 volunteers (youth/students/ social activists) for the promotion of trend of social tree plantation
4.Plantation of 5000 various climate resistant beautification trees/ plants at the various locations of Badin city especially at public places/buildings/ offices/ schools/ roadsides/ streets/irrigation canals
|
|
|
Pakistan
|
Biodiversity
|
2009
|
1,333.33
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: PAK/SGP/OP4/RAF/09/19 |
|
Narreri Lagoon Situated at extreme proximity of sea, a land of about 16000 acres surrounded a deltaic Ramsar site. Narreri Lagoon was thought to be a key resource of coastal fishing livelihood of the local population before the construction of World ( ... )
nded evil mega project of the Left Bank Outfall Drain (L.B.O.D) and before the stoppage of regular sufficient flow of Indus water to the Indus delta.
The Narreri was providing a huge natural hatchery to the fishing stock as well as a great sanctuary to the birds migrated from the upper world during the coldest winters.
This planning grant is awarded to Delta Development Program badin in order
|
|
|
Kazakhstan
|
Climate Change Mitigation
|
2009
|
30,080.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: KAZ/SGP/OP4/Y3/RAF/2009/01 |
|
Implementation of the project demonstrates the replacement of traditional energy sources with alternative sources. The use of solar energy will contribute to improving the environmental situation in the region and reduce emissions of CO2 leading to ( ... )
warming
Project aim:
To demonstrate solar energy use in life and agriculture to population of Tolebiysky district for the purpose of decreasing negative influence of the hotbed gases emissions in atmosphere that leads to climate global warming.
Project tasks:
- Installation of solar collectors and showers
- Installation of solar fruits and vegetables dryers and solar kitchens
-
|
|
|
Tanzania
|
Climate Change Mitigation
|
2009
|
49,422.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: TAN/SGP/OP4/RAF/Y3/09/02 |
|
Context:
Evangelizing Sisters of Mary is a missionary Congregation based in Zinga Bagamoyo. The main objective of the charity is evangelization (spreading the word of God and providing spiritual services). However, they also provide social ( ... )
pment support to local communities particularly, vulnerable groups. The charity has an area, which is surveyed. They also have a borehole, network of pipes and water pump. They are now looking for solar energy in order to pump water from the borehole to the users. Therefore, the request under this proposal focuses on donation for solar panels and accessories for water pumping.
About the
|
|
|
Tanzania
|
Climate Change Mitigation
|
2009
|
47,615.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: TAN/SGP/OP4/RAF/Y3/09/01 |
|
Context:
The Diocese of Mahenge is running a mission hospital titled, St. Francis Hospital which provides in-patient and out-patient services. Fluctuation of power from the National Grid makes the hospital go without power for an average of 4 ( ... )
per year. When power from the national grid is not available, the hospital runs diesel generators to sustain important services like theatre and emergency services particularly caesarean services. Use of diesel generators has three significant challenges:
(i) It pollutes the atmosphere by emitting carbon dioxides which is a greenhouse gas. It is estimated that emissions per year reach a
|
|
|
Kenya
|
Climate Change Mitigation
|
2009
|
50,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: KEN/SGP/OP4/YR3/RAF/09/04 |
|
This project was initiated with a view to improving the quality of life of poor people living in remote off grid rural villages in Kenya by providing them with clean, low cost sources of renewable energy for domestic lighting on a self-sustaining ( ... )
At the same time it aims to demonstrate that illiterate grandmothers from those villages are capable of becoming ?barefoot? solar engineers who can fabricate, install and maintain and repair residential solar lighting systems in their villages after undergoing six months of hands-on training without written materials, tutored by Indian women like themselves who have themselves acquired and are
|
|
|
Bhutan
|
Climate Change Mitigation
|
2009
|
22,000.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: BHU/SGP/OP4/Y2/CORE/09/03 |
|
Singye Dzong in Lhuentse is located within the Bumdeling Wildlife Sanctuary close to the Tibetan boarder. Thousands of pilgrims visit the place and houses several individual retreats and two pilgrimage rest houses. They currently use kerosene ( ... )
candles and other sources of light energy. In a year, the monks and pilgrims easily use up over 1500 liters of kerosene, several bundles of of candles and countless batteries all adding to carbon dioxide emission and hazardous wastes (from batteries). They also burn atleast 24 cubic meters of fuelwood and yakdungs annually adding carbondioxide and carbonmonoxide.
With assistence from BWS,
|
|
|
Cuba
|
Climate Change Mitigation
|
2009
|
25,055.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: CUB/SGP/OP4/Y2/ RAF/2009/07 |
|
El proyecto ?Electrificación solar fotovoltaica de la comunidad rural San José en el macizo montañoso del Escambray? se ejecutará en el asentamiento rural San José, perteneciente al Consejo Popular La Sierrita, municipio Cumanayagua, provincia ( ... )
nfuegos.
El proyecto se propone implementar el uso de fuentes de energía renovables en la electrificación fotovoltaica de viviendas aisladas que no tienen acceso a los servicios eléctricos, la introducción de cocinas de leña eficientes, se trabajará además en el control de especies de plantas invasoras y la reforestación de su ecosistema, en áreas seleccionadas.
El modelo
|
|
|
Eritrea
|
Climate Change Mitigation
|
2009
|
47,019.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: ERI/SGP/OP4/Y2/CORE/2009/04 |
|
Project location is in the Afelba and Quola Seraye districts of Debub Region, some 25 Km west of Mendefera Town.
A total of 16 villages comprising of 2,102 households are beneficiaries of the project. Project duration is for 18 months.
The ( ... )
l objective of the project is to assist the rural communities in the villages of the Afelba and Quola- Seraye districts to adapt to climate change effects through multifocal activities.
The immediate objectives of the project are: to install solar powered IT system for the two schools of Adi-beza and Adi-gulti and conduct tree planting around the schools and religious compounds.
Project
|
|
|
Mauritius
|
Climate Change Mitigation
|
2009
|
19,046.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: MAR/SGP/OP4/Yr2/CORE/08/03 |
|
EXECUTIVE SUMMARY
The Environment Care Association, (ECA) in collaboration with the Ministry of Environment & NDU proposes to launch an intensive sensitization campaign for the sorting out of solid wastes in all primary schools of Mauritius and ( ... )
s proposing to implement a project entitled ? Solid waste segregation in schools?.
The Environment Care Association has been established in 2006 by some senior officers who have retired from the Ministry of Environment & NDU. These officers have a long and rich experience of environmental issues and have volunteered to use this experience to sensitize the population on the subject of
|
|
|
Mauritania
|
Biodiversity
|
2009
|
26,396.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: MAU/SGP/OP4/CORE/09/08 |
|
Le projet consiste à appuyer les populations dépendant des ressources naturelles au niveau des villages périphériques de la moughataa de Kaédi (commune de Djeol) en les réconciliant avec l?élevage traditionnel de basse cour. Il vise à ( ... )
liser la production de l?élevage de la basse cour pour à terme favoriser la régénération des ressources naturelles et leur préservation. Ce projet pilote ambitionne en apportant un environnement favorable à cet élevage, de contribuer à une relance de l?activité tout en favorisant la dissémination dans la zone du projet. Pour une première phase 100 ménages possédant un élevage vont
|
|
|
Iran
|
Multifocal Area
|
2009
|
8,350.00
|
OP3 - Y2 (Mar 06 - Feb 07)
|
|
Project Number: IRA-OP3-2-06-12B (79B) |
Project location:Bujagh protected Area, Sefidroud, Gilan (37.460398;49.921875)
The project activities are:
? Gathering selected SGP projects as cases with experience in conducting formal stakeholder analysis
? Developing the stakeholder ( ... )
is model for replication using the project experiences for demonstration
? Linkage with project ?SepiedRoud Delta Boujagh Protected Area waste Disposal Management, CASPAIN AREA- IRA-OP3-2-06-12A
|
|
|
Tunisia
|
Climate Change Mitigation
|
2009
|
50,000.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: TUN/SGP/OP4/Y3/CORE/09/01 |
|
Objectif du projet :
Le projet « Stratégie et plan d?action pour l?adaptation de Kerkennah aux effets des Changements Climatiques » vise à :
1- Favoriser une approche participative et synergique impliquant tous les acteurs afin notamment de ( ... )
buer à la sensibilisation aux effets néfastes des changements climatiques dont Elévation Accélérée du Niveau de la Mer (EANM)
2- Sensibiliser la population de Kerkennah à la vulnérabilité du littoral tunisien face à une Elévation Accélérée du Niveau de la Mer et aux impacts susceptibles d?être générés par une élévation accélérée du niveau de la mer et de les impliquer dans
|
|
|
Cambodia
|
Biodiversity
|
2009
|
35,379.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: KHM/SGP/OP4/CORE/2009/02 |
|
Prek Toal is the next important touristy destination on Siem Reap and Tonle Sap tourism development. All stakeholders in local touristy sector agreed that Prek Toal will be reached by important tourism (if not massive) tourism in the coming years. ( ... )
volution has already started (the number of tourists visiting Prek Toal is increasing every year).
This project will provide good opportunity for the villages to improve their livelihood could also be highly damageable for both environment (birds colonies, flooding forest?) and the villagers (traditional livelihood) if nothing is done to drive these visitors into environmentally and ethically
|
|
|
Cameroon
|
Biodiversity
|
2009
|
25,582.00
|
OP4 - Y2 (Jul 08 - Jun 09)
|
|
Project Number: CMR/SGP/OP4/Y2/RAF/09/03 |
|
The project on strengthening biodiversity conservation through community based tourism in the lower Sanaga river seeks to raise awareness on threatened birds and mammals species of wetland and forest biodiversity and, and to valorize ( ... )
urism as an alternative income generation activity for a local community, that will promote the values of this rich biodiversity
The project aims to (1) To evaluate the biodiversity value and potential in view of developing a marketing strategy that will promote community based eco-tourism in order to conserve biodiversity by 2010, (2) To train and equip local resource persons
|
|
|
Uzbekistan
|
Climate Change Mitigation
|
2009
|
24,971.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: UZB/SGP/OP4/Y3/RAF/2009/21 |
|
The project has a tremendous potential for Uzbekistan. Most of our irrigation is made from channels where water is being pumped into. This practice requires a huge consumption of electricity for work of the pumps. This happens because gravity ( ... )
tion is seen as not a possible option as much of the water is wasted into infiltration if we elevate the level of channels so that the water can flow because of the gravity.
The project will try to fix this problem by making cheap insulation for an irrigation channel for one Water Users Association. The insulation layer will be made out of plastic tape (sheet) that is put on the bottom and then
|
|
|
Zambia
|
Biodiversity
|
2009
|
39,980.00
|
OP4 - Y3 (Jul 09 - Jun 10)
|
|
Project Number: ZAM/SGP/OP4/Y3/CORE/2009/06 |
|
African Wildlife Foundation & Sekute Community Trust - is an international non-governmental organization founded in 1961 and registered in 2001 to improve the capacity of African institutions and individuals to manage wildlife and other natural ( ... )
ces. Its purpose is to work with people of Africa to ensure the wildlife and wildlife lands of Africa endure forever.
African Wildlife Foundation (AWF) core value is ?African ?led Conservation?.