There are 27,190 projects available.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Tunisia
|
Climate Change Mitigation
|
2013
|
39,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: TUN/GP/SDC/CC/13/01 |
|
Ce projet consiste à la mise en place de 05 parcelles pilotes dans les plantations des agriculteurs de la presqu?ile de Jorf, dans les régions oléicoles de Tamessent, Jorf, Elgrine, Ayati et Boughrara, utilisant le diffuseur enterré comme ( ... )
tion technologique pour l?irrigation souterraine d?appoint anticipée et l?injection de l?eau dans les couches profondes du sol pour une prévention précoce de la sécheresse de longue durée et l?ETP très élevée . Cette activité vise :
? la sauvegarde des plantations oléicoles lors des sécheresses de courte (saisons) et de longues durées (une année à 3 années).
? l?amélioration
|
|
|
Mali
|
Land Degradation
|
2013
|
44,122.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: MLI/SGP/OP5/Y3/STAR/LD/13/08 |
|
La commune rurale de Senko, située au centre-est du cercle de Kita, est soumise au régime du climat soudanien mais connait un rythme de déforestation galopant. En effet, les populations s?adonnent à la coupe du bois de chauffe. Avec le ( ... )
mène de l?urbanisation, du retour des émigrés à Kita, de la venue de nouveaux habitants, de nouveaux espaces forestiers sont défrichés à la faveur de nouveaux habitats de vie qui sont constitués par les populations.
Cette quête d?habitat s?intensifie, s?effectue donc au détriment de la forêt. Hélas, cette action n?est pas compensée par la reforestation au travers des actions
|
|
|
Bhutan
|
Land Degradation
|
2013
|
38,350.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: BHU/SGP/OP5/Y3/STAR/LD/2013/21 |
|
?Pema Chojay Rotpa? lies in the heart of Dangrey village under Changmey Chiwog with area coverage of 5.8 hectare by GPS reading. The chiwog have 196 active households with total land holdings of 191.73 acres of dry land (cultivated) and 90.11 acres ( ... )
land (cultivated) as per the record maintained at the RNR centre. The primary causes of the slides in the area was due to wetland cultivation at the top in the past, existing of marshy land and continues water flow in the area from the farm road above. At the same time, frequent grazing of cattle lead to destruction of existing forest coverage with loosening of soil.
The Zambala land slide area
|
|
|
Bhutan
|
Land Degradation
|
2013
|
14,950.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: BHU/SGP/OP5/Y3/STAR/LD/2013/09 |
|
Toedsang village under Barshong Gewog is one of the remote village under Tsirang dzongkhag. On an average, the people of this village are quite poor hardly making their living hand to mouth. Though, they fully depend on subsistence farming, few ( ... )
s of this village have lost their agricultural land due to heavy monsoon downpour sometimes in 1980?s resulting in the severe landslides. Moreover, the water source which benefits 18 households has been also destroyed. Still now, the farmers are undergoing through this negative environmental calamities losing portion of their arable land frequently to landslides during monsoon. Further, such
|
|
|
India
|
Land Degradation Land Degradation
|
2013
|
16,129.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: IND/SGP/OP5/Y3/STAR/2013/17/GUJ03 |
|
?The area under project was considered as a drought prone area in the past and even though the quantum of rain fall has improved but because of the geographical structure of the area, water was running down from seasonal Fofal River. Due to ( ... )
uous runoff, many problems have been occurred in the area such as land degradation, crop failure, migration of people to urban areas, social unrest, unemployment and the waste of valuable human resources.
?The project is based on the river?s catchment area and the hard core activities in which 35 families and 130 hectares of land are targeted and 34 wells have to be recharged with an additional
|
|
|
Mongolia
|
Biodiversity
|
2013
|
24,650.00
|
OP5 – Y4 (Jul 14 – Jun 15)
|
|
Project Number: MON/COMDEKS/2013/01 |
|
NGO is planning to assist ?SGP/COMDEKS? National Coordinator and National Steering Committees a) to conduct a landscape-wide baseline based on a developed set of indicators for resilience in socio-ecological production landscapes; b) to develop the ( ... )
Country Programme Landscape Strategy following the template and guidelines provided for this purpose; and c) to synthesize lessons learned from the consultation process and baseline
|
|
|
Mongolia
|
Biodiversity
|
2013
|
4,226.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: MON/SGP/OP5/Y3/STAR/BD/13/22 |
|
7 CBOs in Binder soum intend to acquire such tools as a shortwave station and some fire extinguishers to effectively prevent and fight forest fires. This will help protect the forest and its wild animals, use the natural resources in a sustainable ( ... )
d increase the income of the CBO
|
|
|
Timor-Leste
|
Climate Change Mitigation
|
2013
|
12,945.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: TLS/SGP/OP5/Y3/CORE/CC/13/26 |
|
|
|
|
Indonesia
|
Biodiversity
|
2013
|
15,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: INS/SGP/OP5/Y2/STAR/BD/12/001 |
|
GOAL :
Maximizing the development of integrated land management model in karst mountains & grounding the model to the values of local wisdom that can be used as media of advocacy & life skills education for young farmers.
OBJECTIVES
Objective ( ... )
Repair of Water Reservoir
Indicators :
1. The reservoir can collect rain water & waste water coming from household that has been processed with biological treatment as much as 90 m3 volume.
2. The reservoir can serve as a trap mud (eroded material) during the rainy season & it can serve as a rain-fed aquaculture (aquaculture).
3. The reservoir can be used as education media, especially
|
|
|
Egypt
|
International Waters
|
2013
|
40,099.57
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: EGY/SGP/OP5/STAR/Y2/IW/2013/30 |
|
Project aims to protect and preserve agricultural land from degradation, as well as to conserve irrigation water. It will also raise the awareness of farmers on improved irrigation methods |
|
|
Egypt
|
International Waters
|
2013
|
39,190.54
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: EGY/SGP/OP5/STAR/Y2/IW/2013/32 |
|
Lining Irrigation canals in Gbalaw, Ashraf, Faqt Center villages in Qena Governorate, Project aims to protect and preserve agricultural land from degradation, as well as to conserve irrigation water. It will also raise the awareness of farmers on ( ... )
ed irrigation
|
|
|
Egypt
|
International Waters
|
2013
|
49,934.67
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: EGY/SGP/OP5/STAR/Y3/IW/2013/50 |
|
Project aims to line 3 Kms of irrigation canals in Naret karar village, Assuit Governorate, in order to conserve irrigation water, save energy and increase cultivated land |
|
|
India
|
Land Degradation
|
2013
|
2,419.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: IND/SGP/OP5/Y3/STAR/2013/28/MP02 |
|
? In the project area, the livelihood of people is in jeopardy as fish fauna is depleting due to habitat destruction, invasive species, increasing anthropogenic pressure and destructive fishing.
? Due to siltation there is a problem of ground ( ... )
recharge and flooding in the agriculture fields which is in turn is affecting the traditional decision making and conflict resolution systems, widespread ignorance about the various conservation issues among local people on one hand and government departments on the other.
? Samvardhan has started this project in the area of Bembla basin of Karanja Taluka of Washim District for the conservation
|
|
|
Malaysia
|
Biodiversity
|
2013
|
49,806.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: MAL/SGP/OP5/Y2/STAR/BD/13/02 |
|
The project site has a unique ecosystem which is home to more than 500 people. Previous studies reported that more than 80% of the residents in the project area are fishermen whose sole income is fishing. Local community livelihood is threatened by ( ... )
pment in adjacent areas with the conversion of mangroves for agricultural such as oil palm plantations and aquaculture. The loss of mangroves has taken its toll on the fishing community who reported a noticeable reduction in their daily catch. Wetlands International has urged the South East Johore Development Authority (KEJORA) to look into the need of striking the balance between development and
|
|
|
Cambodia
|
Community Based Adaptation
|
2013
|
49,984.71
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: KHM/SGP/CCBAP/Sida/2012/26 |
|
Project objective: To enhance capacity of community in 7 villages to increase farming cycles through rehabilitation of Chke Slab canal.
Outcome 1: Agricultural production, particularly rice and other short term crops by the community received ( ... )
ent water through rehabilitation of Chke Slab canal to benefit 3,578 people, 1,583 women, as a way to adapt to changing rainfall pattern.
Output 1.1 A canal 3,693 m, 2 m deep, 2 m bottom width, and 9 m top width, is rehabilitated.
Activity 1.1.1: Communicate with local authority to convene for metting to disseminate information on the project implementation with beneficiary and relevant
|
|
|
Nepal
|
Land Degradation
|
2013
|
39,318.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: NEP/COMDEKS/2013/03 |
|
The "green revolution" in agriculture doubled cereal production in many parts of the world. But this revolution contributes to 14% of total global greenhouse gas (GHG) emissions, damaging the environment and compromising the global capacity to ( ... )
e food in the future. On the hand, the concept and practices of agro-ecological and ecosystem management has gained increasing attention worldwide in the last two decades. Different reports and studies has also clearly stated that in order to feed more people with sustainable system, there is a need to adopt such effective and sustainable farming system and also recommends a shift toward
|
|
|
Ukraine
|
Land Degradation
|
2013
|
49,937.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: UKR/SGP/OP5/Y3/STAR/LD/13/24 |
|
The main objective of the project is connected with the focal area ?Land Degradation? and directed on implementation of new technologies for organic agriculture. The main practical achievements of the project will be a construction of a ( ... )
tration plot area of 2 hectares with drip irrigation system as well as purchase of tools and materials, seeding material for organic farming; development of detailed design of resettlement land drip irrigation systems; conduction of field practicum "School of wise gardener ".
|
|
|
Malawi
|
CapDev
|
2013
|
30,000.00
|
OP5 - Y2 (Jul 12 – Jun 13)
|
|
Project Number: MLW/SGP/OP5/Y2/CORE/CD/12/18 |
|
Although local community based NGOs and CBOs are best suited to carry out cost effective community based inteventions,there is need to build their capacity to effectively deliver environmental,social and economic benefits in GEF Focal areas. ( ... )
ically there is a great need in undertsanding GEF Focal areas in Malawi Context (policies,activities and programmes).There are also gaps in project development monitoring and evaluation for community based organisation.Other gaps exist in Community Based Natural Resources Management and Reporting in GEF Areas.
Prijects Specific Objectives:
- To increase availability of reference materials and
|
|
|
Jordan
|
Land Degradation
|
2013
|
21,000.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: JOR/SGP/OP5/Y3/STAR/LD/13/06 |
|
This project aims to undertake measures and enhance practices to improve water and land management for attaining better sustainability and reduce land degradation through improving irrigation methods in addition to promoting water conservation and ( ... )
ater harvesting at the household and farm level.
Eara village (project location) located in Salt city is an agricultural land which faces the lack of water resources and drought during summer. Therefore, the implementing CBO and through this project will take the necessary measures to deal with this threat by the installation and rehabilitation of rainwater harvesting cisterns on the household
|
|
|
Timor-Leste
|
Land Degradation
|
2013
|
20,244.00
|
OP5-Y3 (Jul 13 - Jun 14)
|
|
Project Number: TLS/SGP/OP5/Y3/CORE/LD/13/21 |
|
|
|
|