There are 12,310 projects that match your search.
|
|
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
|
Jordan
|
Biodiversity
|
2000
|
16,747.00
|
Phase 2
|
|
Project Number: GEF-JOR-98-G52-22 |
|
The project will enable the NGO to run a revolving fund which will provide funding through full pay back loaning system to local community members to undertake several measures that will contribute to soil conservation measures and sustainable land ( ... )
actices in an arid to semi-arid eco-system south of Jordan. Measures include soil terraces, stone tree basins, under-cropping systems, construction of rain collecting cisterns and other activites. The project will contain a training component as well as an outreach program. The NGO had successfully implemented a first operational phase project dealing with similar activities and received great
|
|
|
Guatemala
|
Biodiversity
|
2000
|
3,635.00
|
Phase 2
|
|
Project Number: PPS-07-2000 |
To rescue local tradition of the plantation of native vegetables among young people of the Quetzaltenango area. This project will establish a series of training workshops and practical activities to establish model organically native vegetable ( ... )
plots in two communities in the vecinities of Quetzaltenango. The project is directed to achieve participation of young men and women, and developing appropriate educational materials to rescue traditional uses of these native
|
|
|
Guatemala
|
Biodiversity
|
2000
|
29,621.00
|
Phase 2
|
|
Project Number: PPS-02-2000 |
OBJECTIVES 1)To provide technical advise and training of trainers to implement a watershed level strategy of organic farming on the Lake Atitlán protected area, to diminish water pollution due to agrochemicals.2)To develop and disseminate ( ... )
riate technical training and educational materials on organic farming techniques and methodologies for 9 NGOs that work on the southwestern region of Guatemala.To provide on-site technical assistance to implement organic farming practices on each organization?s locality.To train participant NGOs Boards of Directors on fair trade and organic markets commercialization requirements. /This project
|
|
|
Papua new guinea
|
Biodiversity
|
2000
|
8,084.00
|
Phase 2
|
|
Project Number: PNG/00/11 |
|
To train communities on how to draw up landuse plans. This was organise to train the trainers who can then train the communities |
|
|
Trinidad and tobago
|
Biodiversity
|
2000
|
11,345.04
|
Phase 2
|
|
Project Number: TRI/98/G52/2101/003 |
|
This is phase 1 of a long-term project to implement a community-based co-management approach to the conservation of a unique, pristine but threatened wetland system in southwestern Trinidad. This phase entails a feasibility study on the area's ( ... )
rism potential. The results of the study will inform a potential community-based project centered on conservation of the wetlands through
|
|
|
Pakistan
|
Biodiversity
|
2000
|
46,933.00
|
Phase 2
|
|
Project Number: PAK/00/10 |
|
A collaboration for rescuing stranded river dolphin from Punjab to Sindh. The project will establish a rescue unit in Sukkur in collaboration with Sind Wildlife department which will rescue Blind Dolphins stranded in the canals. When Canals are ( ... )
ed with water from barrages after their winter closure some dolphins move into those canals with water and are stranded there because they cannot cross the barrages to go back into the river and usually these dolphins die when the water level decreases in these
|
|
|
Papua new guinea
|
Biodiversity
|
2000
|
10,401.00
|
Phase 2
|
|
Project Number: PNG/00/07 |
|
The project was funded as part of the the International Water pollution project to address the threat towards marine pollution in the country and especially promoted public awareness through certain cleanup activities in popular beachfronts,public ( ... )
tional areas and main swimming pools. The organized clean up activities promoted the objectives of the International Coastal Cleanup at a local
|
|
|
Papua new guinea
|
Biodiversity
|
2000
|
20,332.00
|
Phase 2
|
|
Project Number: PNG/00/01 |
|
The capacity building workshop for project coordinators was facilitated and coordinated by Mr. Karol Kisokau, who currently is the Scientific Programme Director with the Research & Conservation Programme of organization. The project facilitated the ( ... )
aining of the project coordinators of grantees under OP2, OP1 & other representatives from the local communities in the areas of Project Management (planning, monitoring & evaluation)&
|
|
|
Albania
|
Biodiversity
|
2000
|
6,935.00
|
Phase 2
|
|
Project Number: ALB/00/20 |
|
The main objective of this project is the preservation and protection of flora and fauna in the Sopot Area. Thus: 80% of local people will be trained on different actions have to be undertaken in the area, like forestry regeneration, area ( ... )
ation etc. 60% of Local Community will be skilled on different actions have to be undertaken for earth protection from erosion; A very important element in the project will be the strengthening of cooperation amongst NGOs, Local Communities and Local Authorities in taking measures for controlling and stopping all activities like hunting of rare species, cutting of woods and rare plants, etc. It
|
|
|
Belize
|
Biodiversity
|
2000
|
1,245.00
|
Phase 2
|
|
Project Number: BZE/00/03 |
|
Planning Grant to prepare project aimed at training and equipping indigenous people from ten communities to monitor biodiversity in their communities using birds as indicator species. |
|
|
Botswana
|
Biodiversity
|
2000
|
43,660.00
|
Phase 2
|
|
Project Number: INT/98/G52/BOT/00/02 |
|
The concerns on Phane have been echoed elsewhere in the Southern Africa region where the caterpillar occurs subsisting on the Mophane vegetation.Studies were initiated in other countries such as Namibia in response to the government enquiry on its ( ... )
The project towards an intergrated suistainable harvesting, management and conservation of phane and mophane woodland focus on socio-economic as well as biophysical aspects sill lacks behind.Therefore this project seeks to find how do biotic factors of temperature, rainfall, fire and soil type influence phane occurrence production and population levels inter and intra seasonaly.
Which of the
|
|
|
Albania
|
Biodiversity
|
2000
|
14,080.00
|
Phase 2
|
|
Project Number: ALB/00/04 |
|
This project aims at:
a) building and developing capacities of environmental specialists and NGO members through a series of training courses, adaptable for different levels;
b) exchanging experience among specialists and NGO members in different ( ... )
of protection and efficient use of biodiversity sources in Albania;
c) offering opportunities for cooperation in the future, as well as for figuring out the areas where NGOs might be involved in protection of biodiversity.
Results include:
Three training courses (3 days) offering methodologies in inventory, planning, management and monitory of biodiversity level in Albania would be held at
|
|
|
Indonesia
|
Biodiversity
|
2000
|
4,270.00
|
Phase 2
|
|
Project Number: GEF-INS/YBUL/OP2-2000-03 |
|
Project development goal:
To strengthen the capability of local NGOs, in order to be able to participate actively in nature resources management, especially as a control body
Project objectives:
1. To increase critical awareness and ( ... )
tanding of ?To Kalekaju? Consortium members on forest management issues, as well as nature resources management as a whole
2. To increase technical capacity of ?To Kalekaju? Consortium members on monitoring methods as well as data collecting techniques
3. To revise and improve the investigation toll/box, in order to be able to provide more accurate data
Activities to be carried out under the
|
|
|
Turkiye
|
Biodiversity
|
2000
|
18,500.00
|
Phase 2
|
|
Project Number: TUR-00-05 |
|
The project's implementation area is the Black Sea Region which carries special importance for Turkey in respect of its biological diversity especially due to its naturally old-growth forest ecosystems and high mountains and its numerous rivers. ( ... )
ed to the whole country, interaction between "forest villagers" and forest ecosystems in this region is more intense. The project aims to ensure the sustainable use and protection of the forest resources by training the "forest villagers", which are damaging their surrounding forest ecosystems as a result of the difficult economic, social and cultural conditions and low level of
|
|
|
Bolivia
|
Biodiversity
|
2000
|
23,901.00
|
Phase 2
|
|
Project Number: BOL/16/00 |
|
El proyecto se lleva a cabo en la población de Tumupasa. Este proyecto se desarrolla en el departamento de La Paz, tiene una duración aproximada de 12 meses.Entidad Ejecutora - CIPTA.
El objetivo del mismo es rescatar y revalorizar conocimientos ( ... )
ionales Tacana, incentivando y capacitando a mujeres y hombres indígenas en el aprovechamiento y comercialización de productos no maderables en la TCO Tacana.
La problemática que se pretende solucionar es la extrema pobreza en la que viven los habitantes del área rural y más aún los pueblos indígenas como también la inseguridad de tenencia de la
|
|
|
Jordan
|
Biodiversity
|
2000
|
38,277.00
|
Phase 2
|
|
Project Number: GEF-JOR-98-G52-17 |
|
Replicating a successful experience implemented by the Productive Women Cooperative in Marka where they rehabilitated the oldest solid waste disposal site in Amman into a park, the Jordanian National Forum for Women will implement the "Um Zaitouneh ( ... )
Rehabilitation of the Old Solid Disposal Site in Salt" project. In an area that evidently used to be a natural forest, the site is located south west of Salt overlooking the Jordan Valley and mountains of Palestine. The Forum, with the full support of the Municipality of Salt, will rehabilitate the site giving the chance to the natural plant cover to be revived. It will establish a
|
|
|
Poland
|
Biodiversity Biodiversity
|
2000
|
18,514.00
|
Phase 2
|
|
Project Number: POL/00/07 |
|
First stage of the long term project aimed on methods of prevention against degradation of wetlands in Western Poland through reduction of excessive runoff of surface waters, raising ground water level and reactivation of proper functioning and ( ... )
ment of wetlands.
|
|
|
Jordan
|
Biodiversity
|
2000
|
35,214.00
|
Phase 2
|
|
Project Number: GEF-JOR-98-G52-14 |
|
To enable women in the Tafileh area to contribute to biodiversity conservation through proper forest management in Abu Banna area located 10 Km east of Tafileh, the General Federation of Jordanian Women will implement the "Women Participation in ( ... )
ersity Protection in Abu Banna- Tafileh" project. The forest is threatened by urban expansion and overgrazing. The Federation will undertake the necessary steps to protect the forest, establish a park for children, renovate an old building on site to be used as a training centre for women and engage the local community in their work through training and public awareness activities and small
|
|
|
Jordan
|
Biodiversity
|
2000
|
40,211.00
|
Phase 2
|
|
Project Number: GEF-JOR-98-G52-18 |
|
The project is implemented by the Builders of the Future Forum with the aim to raise public awareness, particularly among youth on the importance of protecting biodiversity. A training manual, several TV shows, songs and stories will be produced ( ... )
special library will be established to achieve the objectives of this
|
|
|
Kazakhstan
|
Biodiversity
|
2000
|
20,566.00
|
Phase 2
|
|
Project Number: KAZ/00/01 |
|
Desertification keeps aggressing villages and auls. As it was indicated in the Strategic Environmental Program of the Republic of Kazakhstan, the main reasons are not only draughty climatic conditions but also antropogenic factors. These factors ( ... )
ed negatively Aral region, not only the territory close to the sea, but also Sur-Daria river banks, particularly ecosystems of overflow lands inhibited by the main part of population in Kzyl-Orda and north-west South Kasahkstan oblasts. In recent years, the excessive use of overflow lands ecosystems is also caused by transition period crisis. The main part of local population is unable either to
|
|
|