There are 26,002 projects available.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Tunisia
|
Multifocal Area
|
2000
|
50,000.00
|
Phase 2
|
Project Number: TUN/00/07 |
Justifications du projet :
Le projet de développement rural intégré d’El-Brek s’intègre parfaitement dans le domaine prioritaire du FEM relatif à la biodiversité et au changement climatique. Il vise la lutte contre la ( ... )
dation des sols et la désertification dans les douars de Soualmia et de M’Chaïria de l’Imadat d’El Brek par la conservation des eaux et des sols et la reforestation. Il s'inscrit aussi dans la lutte contre la pauvreté, l’amélioration des conditions de vie et de production des populations en zones rurales défavorisées et l’amélioration des conditions de vie des femmes.
|
|
Ecuador
|
Climate Change Mitigation
|
2000
|
24,115.00
|
Phase 2
|
Project Number: ECU/00/003 |
Contribute towards protecting the environment in the Manglaralto communities, decreasing the use of conventional energy and recycling waste in the Educational Complex of the Santa María del Fiat Foundation.
El Objetivo del proyecto es contribuir ( ... )
protección del medio ambiente de las comunidades de Manglaralto, disminuyendo el uso de energía convencional y reciclando desechos dentro del Complejo Educativo de la Fundación Santa María del Fiat.
Los componentes y actividades son:
Contratación de obra.
Compra de materiales y equipo.
Redes hidráulicas:
Construcción de digestor.
Construcción depósito gas.
Equipamiento
|
|
Brazil
|
Biodiversity
|
2000
|
30,000.00
|
Phase 2
|
Project Number: BRA/00/05 |
The 70 families inhabiting the São Francisco Agrarian Reform Settlement, in Nortelândia, state of Minas Gerais, will be mobilized for defense and conservation of biological diversity through capacity building and information exchange activities. ( ... )
entory of flora present in the settlement will be taken, and integrated management of the same will be promoted. Promotion of permaculture, with forest cultivation techniques, diversified production systems, consortia systems, perennial planting groups which can be replicated by other groups, is planned. A collective contract will also be established for species conservation and sustainable
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
21,447.66
|
Phase 2
|
Project Number: EGY-00-20 |
Project's objectives are:
1. To protect the environmental situation in Qena Governorate by encouraging and introducing technologies utilizing the solar energy as clean , new & renewable source, thus minimizing the negative impact emerging from ( ... )
traditional sources.
2. To conduct 10 awareness seminars for the targeted community to introduce it to the project
3. To provide 50 solar heaters to be installed on three phases throughout one year, 5 of which will be installed in public places.
4. To prepare publications promoting solar heaters
5. To conduct
* one training program for the three technicians working in the project
*
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
27,522.00
|
Phase 1
|
Project Number: EGY-00-20 |
• Implement 10 orientations and awareness seminars to introduce the concept of solar energy
• Install 50 solar heaters during the implementation of the three phases of the project.
• Train three (3) persons on heaters' installation and ( ... )
nance
• Establish foundation of environmental library in NGO
|
|
Mauritius
|
Biodiversity
|
2000
|
48,554.00
|
Phase 2
|
Project Number: MAR/98/G52/II/03 |
Winner of the 2001 Whitley Foundation Award: cash prize 25,000 English Pounds and trophy
The aim of the project is to prevent the over-exploitation and possible extinction of a wide range of useful plant species that are endemic to Rodrigues. The ( ... )
t will focus upon developing propagation techniques for endemic handicraft and medicinal plant species and involving the user-community in the safe-guarding of these species, the establishment and sustainable management of community plantations and in awareness-raisisng about the sustainable use of the species. These measures will safeguard the populations of many useful plant species endemic to
|
|
Zimbabwe
|
Biodiversity
|
2000
|
31,251.81
|
Phase 2
|
Project Number: ZIM/98/G52/035 |
The project is focussed on the preservation and sustainable utilisation of a palm locally known as Ilala found in western Zimbabwe. The palm is threatened with extinction due to unsustainable harvesting methods especially by peoples from other ( ... )
s of the country for purposes of weaving basketry effects. The project components include regeneration of ilala forests, training on protection and sustainable harvesting inventories and general environmental activities.
Project objectives
1. to protect and restore the biological diversity of the illala palm forests in the Jotsholo area in lupane
2. to promote the sustainable utilization of
|
|
Jordan
|
Biodiversity
|
2000
|
16,747.00
|
Phase 2
|
Project Number: GEF-JOR-98-G52-22 |
The project will enable the NGO to run a revolving fund which will provide funding through full pay back loaning system to local community members to undertake several measures that will contribute to soil conservation measures and sustainable land ( ... )
actices in an arid to semi-arid eco-system south of Jordan. Measures include soil terraces, stone tree basins, under-cropping systems, construction of rain collecting cisterns and other activites. The project will contain a training component as well as an outreach program. The NGO had successfully implemented a first operational phase project dealing with similar activities and received great
|
|
Guatemala
|
Biodiversity
|
2000
|
3,635.00
|
Phase 2
|
Project Number: PPS-07-2000 |
To rescue local tradition of the plantation of native vegetables among young people of the Quetzaltenango area. This project will establish a series of training workshops and practical activities to establish model organically native vegetable ( ... )
plots in two communities in the vecinities of Quetzaltenango. The project is directed to achieve participation of young men and women, and developing appropriate educational materials to rescue traditional uses of these native
|
|
Poland
|
Climate Change Mitigation
|
2000
|
513.00
|
Phase 2
|
Project Number: POL/00/09p |
cost of feasibility study done by the Institute of Hydrology and Metorogy in Warsaw on possible installation of power grnrtaion wind-mills near Siemianowka Lake;project proposal was received without a serious datas |
|
Guatemala
|
Biodiversity
|
2000
|
29,621.00
|
Phase 2
|
Project Number: PPS-02-2000 |
OBJECTIVES 1)To provide technical advise and training of trainers to implement a watershed level strategy of organic farming on the Lake Atitlán protected area, to diminish water pollution due to agrochemicals.2)To develop and disseminate ( ... )
riate technical training and educational materials on organic farming techniques and methodologies for 9 NGOs that work on the southwestern region of Guatemala.To provide on-site technical assistance to implement organic farming practices on each organization’s locality.To train participant NGOs Boards of Directors on fair trade and organic markets commercialization requirements. /This project
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
30,366.00
|
Phase 2
|
Project Number: EGY-00-16 |
Project's objectives are:
1. To protect the environment through promoting the use of new & renewable energy instead of traditional energy to minimize its negative impacts.
2. To Minimize the high cost of solar heaters by introducing the mechanism ( ... )
ing on installments that is suitable to the public.
3. To raise the public awareness in Minia City.
4. To install 65 solar heaters with a capacity of 150 liter/ heater.
5. To training 4 people on how to maintain and service the solar
|
|
Egypt
|
|
2000
|
30,366.00
|
Pilot Phase
|
Project Number: EGY-00-16 |
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
29,023.00
|
Phase 2
|
Project Number: EGY-00-10 |
Project objectives are:
1. To promote new and renewable energy in 5 villages in Minya Governorate
2. To conserve energy and time used for cooking on traditional ovens
3. To adapt and apply appropriate technology
4. To install 56 solar heaters ( ... )
capacity of 150 liter each.
5. To upgrade 30 traditional ovens
6. To train 10 technicians on how to install and maintain the heaters
7. To train 5 builders and 5 blacksmen on manufacturing upgraded ovens
8. To protect the health of the women using traditional
|
|
Egypt
|
|
2000
|
29,023.00
|
Pilot Phase
|
Project Number: EGY-00-10 |
|
|
Papua new guinea
|
Multifocal Area
|
2000
|
16,667.00
|
Phase 2
|
Project Number: PNG/00/09 |
This has been an Environmental News Letter published by Conservation Melansea Inc. (Local NGO). The purpose of this news letter was to deseminate project information and work carried out in the country and abroad. They have now being funded twice. |
|
Papua new guinea
|
Biodiversity
|
2000
|
8,084.00
|
Phase 2
|
Project Number: PNG/00/11 |
To train communities on how to draw up landuse plans. This was organise to train the trainers who can then train the communities |
|
Trinidad and tobago
|
Biodiversity
|
2000
|
11,345.04
|
Phase 2
|
Project Number: TRI/98/G52/2101/003 |
This is phase 1 of a long-term project to implement a community-based co-management approach to the conservation of a unique, pristine but threatened wetland system in southwestern Trinidad. This phase entails a feasibility study on the area's ( ... )
rism potential. The results of the study will inform a potential community-based project centered on conservation of the wetlands through
|
|
Thailand
|
Climate Change Mitigation
|
2000
|
7,234.00
|
Phase 2
|
Project Number: THA/00/G29 |
It is , at present, apparent that the world is consuming the natural resources and energy at
an alarming rate. It is occurring in all scales of society: community scale and national commercial scale. All these contribute to the accumulation ( ... )
e green house gas in the atmosphere which is apt to produce bad consequences to humanity. The project location, an agricultural community, has carried out development process on sustainable agriculture starting from the production , food processing and marketing. The food processing requires the application of heat obtained from oven. This oven is a product of indigenous knowledge and gives
|
|
Pakistan
|
Biodiversity
|
2000
|
46,933.00
|
Phase 2
|
Project Number: PAK/00/10 |
A collaboration for rescuing stranded river dolphin from Punjab to Sindh. The project will establish a rescue unit in Sukkur in collaboration with Sind Wildlife department which will rescue Blind Dolphins stranded in the canals. When Canals are ( ... )
ed with water from barrages after their winter closure some dolphins move into those canals with water and are stranded there because they cannot cross the barrages to go back into the river and usually these dolphins die when the water level decreases in these
|
|
Papua new guinea
|
Biodiversity
|
2000
|
10,401.00
|
Phase 2
|
Project Number: PNG/00/07 |
The project was funded as part of the the International Water pollution project to address the threat towards marine pollution in the country and especially promoted public awareness through certain cleanup activities in popular beachfronts,public ( ... )
tional areas and main swimming pools. The organized clean up activities promoted the objectives of the International Coastal Cleanup at a local
|
|
Thailand
|
International Waters
|
2000
|
9,825.00
|
Phase 2
|
Project Number: THA/00/G13 |
Since 1992, the Phong River, a tributary of the Mekhong River has been under continuous threats which include toxic chemicals, from both industries and agriculture. While the industries upstream are dumping untreated waste into the river, the ( ... )
ities are making the situation worse by unscrupulous disposal of household waste. The effect of the pollution has been witnessed by the death of fishes along the river and residue in human bodies.
Since the project location comprises 10 farming communities with 1,363 families depending upon the river for agriculture and other domestic use, the threats directly affects the livelihood of these
|
|
Papua new guinea
|
Biodiversity
|
2000
|
20,332.00
|
Phase 2
|
Project Number: PNG/00/01 |
The capacity building workshop for project coordinators was facilitated and coordinated by Mr. Karol Kisokau, who currently is the Scientific Programme Director with the Research & Conservation Programme of organization. The project facilitated the ( ... )
aining of the project coordinators of grantees under OP2, OP1 & other representatives from the local communities in the areas of Project Management (planning, monitoring & evaluation)&
|
|
Albania
|
Multifocal Area
|
2000
|
13,626.00
|
Phase 2
|
Project Number: ALB/00/19 |
The main aim of the project is the protection of the biodiversity in the Bedeni Forest (near Kavaja)as well as the protection of coastal waters in the Gjenerali Beach. Participation of Local Community in different actions for biodiversity protection ( ... )
idered the key element in the project success. Local Community in accordance with the Biodiversity Protection Strategy will implement different concrete measurement. Mention should be made on cleaning and forestation of a part in Bedeni Forest (1000 saplings will be planted); some actions against erosion will take place inside the Forest; a tourist infrastructure will be prepared for the area;
|
|
Palestinian authority
|
Climate Change Mitigation
|
2000
|
49,850.00
|
Phase 2
|
Project Number: PAL/00/12 |
The project will introduce and promote the use of biogas technology in the Palestinian community particularly among farmers and industries by studying the factors and variables affecting the efficient production of biogas through establishing pilot ( ... )
perimental unit to produce gas from the orange rinds and chicken guts and some agricultural residues as a raw material. Through variety of activities, the project will also disseminate the experience of the renewable energy technology by organizing workshops, site visits and producing publications to raise community awareness of the feasibility and possible replicability of the new
|
|
Poland
|
Multifocal Area
|
2000
|
1,000.00
|
Phase 2
|
Project Number: POL/00/04p |
preparatory work for creation of white stork education center to implement a project proving links between eco-agriculture and numerous white stin Krzesinski Landscape Park, on Oder River, border with Germany. |
|
Albania
|
Biodiversity
|
2000
|
6,935.00
|
Phase 2
|
Project Number: ALB/00/20 |
The main objective of this project is the preservation and protection of flora and fauna in the Sopot Area. Thus: 80% of local people will be trained on different actions have to be undertaken in the area, like forestry regeneration, area ( ... )
ation etc. 60% of Local Community will be skilled on different actions have to be undertaken for earth protection from erosion; A very important element in the project will be the strengthening of cooperation amongst NGOs, Local Communities and Local Authorities in taking measures for controlling and stopping all activities like hunting of rare species, cutting of woods and rare plants, etc. It
|
|
Belize
|
Biodiversity
|
2000
|
1,245.00
|
Phase 2
|
Project Number: BZE/00/03 |
Planning Grant to prepare project aimed at training and equipping indigenous people from ten communities to monitor biodiversity in their communities using birds as indicator species. |
|
Botswana
|
Biodiversity
|
2000
|
43,660.00
|
Phase 2
|
Project Number: INT/98/G52/BOT/00/02 |
The concerns on Phane have been echoed elsewhere in the Southern Africa region where the caterpillar occurs subsisting on the Mophane vegetation.Studies were initiated in other countries such as Namibia in response to the government enquiry on its ( ... )
The project towards an intergrated suistainable harvesting, management and conservation of phane and mophane woodland focus on socio-economic as well as biophysical aspects sill lacks behind.Therefore this project seeks to find how do biotic factors of temperature, rainfall, fire and soil type influence phane occurrence production and population levels inter and intra seasonaly.
Which of the
|
|
Albania
|
Biodiversity
|
2000
|
14,080.00
|
Phase 2
|
Project Number: ALB/00/04 |
This project aims at:
a) building and developing capacities of environmental specialists and NGO members through a series of training courses, adaptable for different levels;
b) exchanging experience among specialists and NGO members in different ( ... )
of protection and efficient use of biodiversity sources in Albania;
c) offering opportunities for cooperation in the future, as well as for figuring out the areas where NGOs might be involved in protection of biodiversity.
Results include:
Three training courses (3 days) offering methodologies in inventory, planning, management and monitory of biodiversity level in Albania would be held at
|
|
Turkey
|
Multifocal Area
|
2000
|
50,000.00
|
Phase 2
|
Project Number: TUR-00-14 |
The capacity building programme is intended to educate a broad-based national and local NGOs about the GEF / SGP - its mission, strategy, policies and procedures. It will also provide practical information on how to attain access to GEF resources ( ... )
w to propose, prepare and implement GEF / SGP financed activities; promote country level co-ordination and sharing of information on best practices and lessons learned. At least 100 NGOs will be trained through 5 regional training seminars. Each will have a duration of 3 days and will be held in 5 different locations: in Ankara for NGOs executing in Central Anatolia, in Antalya for NGOs executing
|
|
Indonesia
|
Biodiversity
|
2000
|
4,270.00
|
Phase 2
|
Project Number: GEF-INS/YBUL/OP2-2000-03 |
Project development goal:
To strengthen the capability of local NGOs, in order to be able to participate actively in nature resources management, especially as a control body
Project objectives:
1. To increase critical awareness and ( ... )
tanding of “To Kalekaju” Consortium members on forest management issues, as well as nature resources management as a whole
2. To increase technical capacity of “To Kalekaju” Consortium members on monitoring methods as well as data collecting techniques
3. To revise and improve the investigation toll/box, in order to be able to provide more accurate data
Activities to be carried out
|
|
Turkey
|
Biodiversity
|
2000
|
18,500.00
|
Phase 2
|
Project Number: TUR-00-05 |
The project's implementation area is the Black Sea Region which carries special importance for Turkey in respect of its biological diversity especially due to its naturally old-growth forest ecosystems and high mountains and its numerous rivers. ( ... )
ed to the whole country, interaction between "forest villagers" and forest ecosystems in this region is more intense. The project aims to ensure the sustainable use and protection of the forest resources by training the "forest villagers", which are damaging their surrounding forest ecosystems as a result of the difficult economic, social and cultural conditions and low level of
|
|
Mali
|
Climate Change Mitigation
|
2000
|
5,936.62
|
Phase 2
|
Project Number: MLI/00/18 |
Ce projet vise a renforcer la conscience environnementale, améliorer le cadre de vie a travers la valorisation des déchets domestiques
Objectifs spécifiques - Assainissement de Djélibougou ;
- Production bon marché d’engrais en vue de ( ... )
élioration de la productivité agricole, grâce a une amélioration de la structure et de la fertilité des sols ;
- Une amélioration des économies des agriculteurs ;
- Création d’emplois pour une population rurale jeune de plus en plus nombreuse dans la ville ;
- Faire une démonstration pour les populations urbaines qui sauront mieux profiter de leurs déchets domestiques ;
- Ouvrir
|
|
Cote d'ivoire
|
International Waters
|
2000
|
18,908.00
|
Phase 2
|
Project Number: IVC/98/G52/009 |
Réaliser une étude diagnostique de l'état de pollution du systeme fluvio-lagunaire Bia-Aby-Tanoë en vue d'élaborer une cartographie saisonniere comportant des données hydrobiologique et hydrochimique. |
|
Bolivia
|
Biodiversity
|
2000
|
23,901.00
|
Phase 2
|
Project Number: BOL/16/00 |
El proyecto se lleva a cabo en la población de Tumupasa. Este proyecto se desarrolla en el departamento de La Paz, tiene una duración aproximada de 12 meses.Entidad Ejecutora - CIPTA.
El objetivo del mismo es rescatar y revalorizar conocimientos ( ... )
ionales Tacana, incentivando y capacitando a mujeres y hombres indígenas en el aprovechamiento y comercialización de productos no maderables en la TCO Tacana.
La problemática que se pretende solucionar es la extrema pobreza en la que viven los habitantes del área rural y más aún los pueblos indígenas como también la inseguridad de tenencia de la
|
|
Poland
|
Multifocal Area
|
2000
|
9,480.00
|
Phase 2
|
Project Number: POL/00/14 |
increasing biodiversity through planting trees and coppices; erosion, water eutrofication and pollution prevention with active participation of local community and schools .
7 hectares in total was afforested in small plots and belts by local ( ... )
s together with youth from local schools along slopes of Hancza lake especially where erosion arrived , caused by intensive activities and illegal construction of summer houses and surface
|
|
Jordan
|
Biodiversity
|
2000
|
38,277.00
|
Phase 2
|
Project Number: GEF-JOR-98-G52-17 |
Replicating a successful experience implemented by the Productive Women Cooperative in Marka where they rehabilitated the oldest solid waste disposal site in Amman into a park, the Jordanian National Forum for Women will implement the "Um Zaitouneh ( ... )
Rehabilitation of the Old Solid Disposal Site in Salt" project. In an area that evidently used to be a natural forest, the site is located south west of Salt overlooking the Jordan Valley and mountains of Palestine. The Forum, with the full support of the Municipality of Salt, will rehabilitate the site giving the chance to the natural plant cover to be revived. It will establish a
|
|
Philippines
|
Multifocal Area
|
2000
|
3,896.00
|
Phase 2
|
Project Number: S/OP-30.00-Nc |
Writeshop for UNDP GEF SGP grantees and potential NGO/PO partners to provide a shared foundation of understanding about the GEF/SGP purpose, structures and operations. Activities included the exchange of information on the status of UNDP GEF ( ... )
nded projects, discussions on the environment scenario, sharing of procedures/guidelines on the GEF medium-sized programme and other funding facilities, and initial critiquing of project proposals preapred by potential grantees. Writeshops were conducted in the three (3) major island groups in the Philippines - Luzon, Visayas, and
|
|
Philippines
|
Multifocal Area
|
2000
|
5,480.00
|
Phase 2
|
Project Number: S/OP-30.00-Na |
Writeshop for UNDP GEF SGP grantees and potential NGO/PO partners to provide a shared foundation of understanding about the GEF/SGP purpose, structures and operations. Activities included the exchange of information on the status of UNDP GEF ( ... )
nded proejcts, discussions on the environment scenario, sharing of procedures/guidelines on the GEF medium-sized programme and other funding facilities, and initial critiquing of project proposals prepared by potential grantees. Writeshops were conducted in the three (3) major island groups in the Philippines - Luzon, Visayas, and
|
|
Philippines
|
Multifocal Area
|
2000
|
6,011.00
|
Phase 2
|
Project Number: S/OP-30.00-Nb |
Writeshop for UNDP GEF SGP grantees and potential NGO/PO partners to provide a shared foundation of understanding about the GEF/SGP purpose, structures and operations. ACtivities included the exchange of information on the status of UNDP GEF ( ... )
nded projects, discussions on the environment scenario, sharing of procedures/guidelines on the GEF medium-sized programme and othe funding facilities, and initial critiquing of project proposals preapred by potential grantees. Writeshops were conducted in the three (3) major island groups in the Philippines - Luzon, Visayas, and
|
|
Philippines
|
Multifocal Area
|
2000
|
6,100.00
|
Phase 2
|
Project Number: S/OP-30.00-Nd |
Writeshop for UNDP GEF SGP grantees and potential NGO/PO partners to provide a shared foundation of understanding about the GEF/SGP purpose, structures and operations. Activities included the exchange of information on the status of UNDP GEF ( ... )
nded projects, discussions on the environment scenario, sharing of procedures/guidelines on the GEF medium-sized programme and other funding facilities, and critiquing of project proposals preapred by potential grantees. Writeshops were conducted in the three (3) major island groups in the Philippines- Luzon, Visayas, and
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
48,585.00
|
Phase 2
|
Project Number: EGY-00-06 |
The project will manufacture a unit that converts agricultural wastes into briquettes to be used to replace fossil fuel. The units will be used in Kalubia Governorate.
The project's objectives are:
1. To convert biomass into a solid fuel ( ... )
ettes) to be used as an energy source that is equivalent to millions of Ton Oil Equivalent/ year.
2. To convert the agriculture waste into uniform shaped briquettes that is easy to transport and store. The briquettes have better physical and combustion characteristics than the initial waste.
3. To kill insects & diseases as well as to reduce the destructive fires risk in countryside.
4. To
|
|
Egypt
|
|
2000
|
48,585.00
|
Pilot Phase
|
Project Number: EGY-00-06 |
|
|
Egypt
|
|
2000
|
48,585.00
|
Pilot Phase
|
Project Number: EGY-00-06 |
|
|
Egypt
|
|
2000
|
30,539.00
|
Pilot Phase
|
Project Number: EGY-00-07 |
|
|
Indonesia
|
Climate Change Mitigation
|
2000
|
27,388.00
|
Phase 2
|
Project Number: GEF-INS/YBUL/OP2-2000-011 |
Project development Goal :
To increase community welfare and reducing the uses of conventional energy
Project Objectives :
1. To provide environmentally friendly energy alternative
2. To provide education media and raising awareness on ( ... )
alternative
3. To build the knowledge on sound utilization of the nature resources
4. To increase community’s standard of living through developing economic activities using the
electricity produced
5. To increase community’s awareness and community involvement in conserving the water
catchment area in Seloliman’s protected forest
6. To establish a strong cooperative, which will
|
|
Egypt
|
Climate Change Mitigation
|
2000
|
30,539.00
|
Phase 2
|
Project Number: EGY-00-07 |
The project will upgrade one charcoal kiln in Sahil Sleem Village in Assuit Governorate.
The objectives are:
1. To improve the efficiency of converting agricultural residues into charcoal
2. To demonstrate the effectiveness of an improved dual ( ... )
charcoal kiln
3. To produce new, renewable and clean energy
4. To reduce the effect of emissions on climate change
5. To solve one of the major problems facing people working in the charcoal
|
|
Thailand
|
International Waters
|
2000
|
7,170.00
|
Phase 2
|
Project Number: THA/00/G33 |
The target community is the population residing along and depending upon the Ing River which is an ecological part of the greater Mekhong River. With its length of 240 km., there is the popular reservoir “Kwan Phayao”. When the population ( ... )
mand for food is increasing,many native fishes species has faced extinction. In 1998, an official survey has revealed that 28 species out of original of 52 had disappeared from the project location. Added to the ever-increasing demand for water species is human activities which prompt the disposal of community waste into the river and its tributaries.
Instilling conservation awareness of
|
|
Poland
|
Climate Change Mitigation
|
2000
|
13,914.00
|
Phase 2
|
Project Number: POL/00/23 |
Thousands of hectars of cultivated before land is not cultivated and left as a fallow because of very high production cost (eg. cost of fuel ) and also because on not competitive prices;One of solution is to use this fallow land for energy ( ... )
tion (rape-seed oil, or fast growing plants).
Project's target is to train farmers, select those who are willing to organize themselves and participate in 50% cost of installation o f agro-refinery based on rape-seed oil.then organize association l
Project was continued see
|
|