There are 285 projects that match your search.
|
Project Title |
Country |
Area Of Work
|
Start Date |
Amount (US$) |
Operational Phase |
|
Jordan
|
Climate Change Mitigation
|
2022
|
45,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/CC/21/03 |
The project aims to transfer part of the association building to become a Net-Zero building, and provide training to local community on building retrofitting and renewable energy installation. This will help in building the capacity of individuals ( ... )
ocal community on green jobs, in addition the association, which will provide help for people with disabilities and contribute to the awareness of climate change mitigation actions to those students and their
|
|
Jordan
|
Biodiversity
|
2022
|
20,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/10 |
|
|
Jordan
|
Biodiversity
|
2022
|
35,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/06 |
|
|
Jordan
|
Biodiversity
|
2022
|
34,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y1/ICCA-GSI-COVID/2021/02 |
The project aims to enforce documentation and transmission of the traditional medicinal knowledge in Jordan and networking between indigenous knowledge holders and stakeholders. The project will support Indigenous peoples and local communities ( ... )
) via documenting and transmission of their knowledge, and strengthen their short-term coping mechanisms as well as their long-term socio-ecological
|
|
Jordan
|
Biodiversity
|
2022
|
30,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y1/ICCA-GSI-COVID/2021/06 |
The project introduces the application of agroecological methods of farming to improve soil health and the soil’s water retention. Improved water retention rates maximizes the use of the resource and provide great potential to aid in water ( ... )
vation methods within the farms. It may also contribute to the management of soil and water quality and desalination, which is of growing importance in Jordanian
|
|
Jordan
|
Climate Change Mitigation
|
2022
|
30,000.00
|
OP6 –Y7 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP6/Y4/STAR/CC/21/39 |
The project will put on place a revolving fund for RE systems and energy efficient appliances, this will reduce the pressure on their income, in the same time it will contribute to the wide spread of RE systems and EE appliances which contribute to ( ... )
erall CO2 abatement. The project is located in Jordan Valley, an area heavily dependent on agriculture and most population are working in agriculture, in the same time the area is considered one of the poverty spots in the country. The area is known for its very hot and humid, people depend on air conditioning in the hot summer days and food refrigeration to keep an acceptable temperature, this
|
|
Jordan
|
Biodiversity
|
2022
|
36,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/04 |
|
|
Jordan
|
Biodiversity
|
2022
|
10,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/07 |
|
|
Jordan
|
Biodiversity
|
2022
|
10,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/02 |
|
|
Jordan
|
Climate Change Mitigation
|
2022
|
20,000.00
|
OP6 –Y7 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP6/Y4/CORE/CC/21/46 |
The project will promote the use of “Rainwater Harvesting Wells” as an alternative source of water at the household level. Thirteen harvesting wells will be built with twenty-five cubic meter capacity for a number of local community’s members. ( ... )
ject will also include raising the local community awareness of rainwater harvesting wells their positive impacts on the environment, besides the optimum ways of rationalizing water consumption.
|
|
Jordan
|
Biodiversity
|
2022
|
22,100.00
|
OP6 –Y7 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP6/Y5/STAR/BD/22/01 |
|
|
Jordan
|
Biodiversity
|
2022
|
20,900.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/11 |
|
|
Jordan
|
Biodiversity
|
2022
|
20,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y1/ICCA-GSI-COVID/2021/07 |
The project will focus on the plantation of rare endangered herbal flora species to be used to medical and food purposes. This project will create multiple job opportunities for several local community members; especially youth and women, thus ( ... )
izing and contributing on their livelihood and provide a sustainable source of income for the CBO. The project will also include marketing these herbal products after packaging and an awareness component on herbal species and solid waste management targeting the local community.
|
|
Jordan
|
Biodiversity
|
2022
|
38,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/05 |
|
|
Jordan
|
Biodiversity
|
2022
|
10,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/08 |
|
|
Jordan
|
Biodiversity
|
2022
|
33,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/09 |
|
|
Jordan
|
Biodiversity
|
2022
|
45,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y1/ICCA-GSI-COVID/2021/03 |
The project aims to use traditional knowledge in the medicinal and food production of native species as new source for local food security and source of income, in the same time improve the nutrition and immunity levels for local community by ( ... )
ing these products to provide better livelihood and health during emergency times improving their resilience and
|
|
Jordan
|
Biodiversity
|
2022
|
30,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/01 |
|
|
Jordan
|
Biodiversity
|
2022
|
42,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y2/CORE/BD/22/03 |
|
|
Jordan
|
Biodiversity
|
2022
|
47,000.00
|
OP7 –Y2 (Jul 21-Jun 22)
|
Project Number: JOR/SGP/OP7/Y1/ICCA-GSI-COVID/2021/05 |
The project aims to provide better support and tools for local community to use their traditional knowledge in food and medicinal aspects to provide better livelihood and health during emergency times improving their resilience and inclusiveness. |
|